Sarıseki Osb İş Merkezi No:5  İskenderun / Hatay
Tel.:  (326) 656 26 23

Automation Projects (PLC-DCS & Scada Programming for Plant, Process, Machine Systems)
AC Drive (Frequency Converter) Applications (Pump, Motor, Fan)
Electrical Works (Cabling, Panel Design etc.)
High Voltage, Medium Voltage Applications and Consultancy
MV Relay Protection and Function Tests
Transformator Tests
Transformator Facilities (Maintanence, Oil Gas Analysing, Oil Re-treatment)
Energy Saving Applications
Fibre-optic works (Cabling, Terminating, Repairing)
Industrial Bus Communications (Data transfer between protocols (Modbus, Profibus, IEC61850, TCP-IP, Wi-Fi, RadioLink)
Grounding-Earthing-Isolation Measurement
Reactive Power Compensation (LV systems and MV Sytems -SVC)
Energy Monitoring Systems

MILESTONES on Our Experiences
* Process Automation and Electrical Supervising on TOSYALI Osmaniye Air Seperation Plant, 2010-2013
* Process Automation and Electrical Supervising on TOSYALI Osmaniye Water Treatment Plants, 2010-2013
* HV & MV Operation Responsibilities for TOSYALI OSMANİYE (including 380kV TOSÇELİK Main Substation, Dirty & Clean Buses) , 2010-2013
* Power and Distribution Transformers Maintanence and Operation Facilities, 2010-2013
- 125MVA 380/34.5kV TOSYALI Osmaniye Main Substation 4 Power Transformers Operation and Maintanence
- 80MVA, 34.5kV TOSYALI Algeria Arc Furnace Transformer FAT (Alstom TR - April 2013)
- 25MVAR, 34.5kV TOSYALI Algeria Arc Furnace Reactor FAT (Alstom TR - April 2013)
- 15MVA, 34.5kV TOSYALI Algeria Laddle Furnace Transformer FAT (Alstom TR - April 2013)
- 31.5MVA 34.5kV TOSYALI Osmaniye HSM Power Transformer Maintanence Op. (ABB TR - March 2013)
- 25MVA 34.5kV TOSYALI Osmaniye EAF-LF-CCM Power Transformer Maintanence Op. (SÖNMEZ TR - June 2013)
- 2.5MVA 34.5kV TOSYALI Osmaniye ERW Pipe Plant 16 Dist. Transformers FAT (BEST TR - March 2013)

* MV AC Pump Drives Set-Up and Operation for Water Treatment Plant